Preliminary and detailed design studies for a Bus Rapid Transit (BRT) public transport line (20 km of specialized urban roads) in Abidjan

CLIENT : Ministry of Transport of Ivory Coast, PRICI / World BankPERIOD: April 2019 – In progress
PARTNER: LOGIT Brazil, SPEA ItalyCOUNTRY: Ivory Coast
FUNDING : World Bank

SUMMARY OF THE MISSION

The Government of the Republic of Ivory Coast has obtained funding for the studies required to prepare the Greater Abidjan Port-City Integration Project (PACOGA). Part of these financial resources is used for the consultancy services for the preliminary and detailed design studies of a Bus Rapid Transit (BRT) line in Abidjan. The LOGIT (Brazil) / SPEA (Italy) / BPL (Ivory Coast) Group has been selected to carry out this mission, which is a first in Ivory Coast.

In a specific way, the LOGIT / SPEA / BPL Group is responsible for carrying out:

  • The APS studies allow to refine the reflections relating to the components of the BRT system, its operation, and its effect within the framework of the implementation of a sustainable transport;
  • The APD studies which aim to determine the detailed quantities of all the elements of the BRT network, to establish in plans, sections and facades, the dimensions of the urban road infrastructures, of the structures (including interchanges, hoppers, a tunnel), of the drainage system and of the equipment, to define the constructive principles, the materials and the technical installations of the BRT network and to establish the final estimate of the provisional cost of the works, broken down into separate lots.
  • The consultant’s analysis includes both technical and road safety aspects.

Description of services actually performed by your staff :

The activities carried out by our teams are :

  • REALIZATION OF PRELIMINARY STUDIES
    • Provisional report of the study of the choice of service offer (conceptual design)
    • Final report of the study of the choice of service offer
    • Provisional report of the preliminary analysis of the impacts of the chosen solution
    • Final report of the preliminary analysis of the impacts of the chosen solution

  • REALIZATION OF ECONOMIC STUDIES
    • Provisional report of the Economic Study
    • Final report of the Economic Study
    • Final APS report of the BRT line (20 km of specialized urban roads) on its own site

  • REALIZATION OF THE DETAILED TECHNICAL STUDIES (APD)
    • Provisional APD report for the BRT line (20 km of dedicated urban roadway) on exclusive right-of-way
    • Interim Confidential File
    • Final PDSA Report
    • Final Confidential File
    • Layer set

  • ESTABLISHMENT OF THE COMPANY CONSULTATION FILE
    • Provisional version of the consultation file for companies
    • Final version of the consultation file for companies