PROJECT OWNER : Ministry of Transport / Abidjan Urban Mobility Project (PMUA) | PERIOD: 2019-2022 |
FUNDING : Banque mondiale et Agence Française de Développement | COUNTRY: Ivory Coast |
PARTNER : TED Burkina Faso |
SUMMARY OF THE MISSION
BRT type express bus line, Linear 20 km
This BRT line is about 20 km long and runs along the axis of the 4th bridge. The project, which should be delivered in 2024, also aims to strengthen the operational capacities of SOTRA, which is one of the main stakeholders, and to reorganize its feeder lines on the mass transit routes.
Global financing : 530 millions de Dollars
Lessors : World Bank and French Development Agency
Number of stations : 20
Number of deposits : 02
More than 500,000 passengers per day
Infrastructure component:
Continuous reinforced concrete roadway over 20 km, with several viaducts, some of which are more than 1,000 m long, and about twenty mixed structure footbridges.
Services provided by BPL and its partners LOGIT and TECNE
- Technical studies of APS and ODA
- Tender files for tenders