CLIENT : CI-ENERGIES | PERIOD: 2022 – in progress |
FUNDING : African Development Bank (ADB) | COUNTRY: Ivory Coast |
PARTNER : SOFRECO |
SUMMARY OF THE MISSION
The PROSER aims to electrify 1,088 localities, including 283 on own funding from the State of Côte d’Ivoire. The AfDB loan concerns the remaining 805 localities that are in eight (8) districts in Côte d’Ivoire. The markets of the 805 and localities have passed through Calls for tenders:
- AOI N° T 263/2020 : Electrification work of 231 localities in the regions of FOLON, KABADOUGOU, BAGOUE, PORO, TCHOLOGO and GONTOUGO
- AOI N° T 264/2020 : Electrification work of 240 localities in the BOUNKANI region.
- AOI N° T 265/2020 : Electrification work of 334 localities in the regions of INDENIE-DJUABLIN, SUD-COMOE, BELIER, IFFOU, MORONOU, N’ZI, GRANDS-PONTS, GBEKE, HAMBOL, YAMOUSSOUKRO and BOUNKANI.
Consistency of the Mission :
- Control of studies;
- Control of supplies (quality, conformity and quantity of equipment);
Supervision of work and supervision of testing and commissioning of works